The Brief
The existing heating and hot water plant was failing due age, the plantroom was located on the roof area, replacement of the plantroom would have to be completed with the hotel in operation during the height of the season. The cold water booster set was also failing due to age, this would also have to be replaced during high occupancy live hotel operation. No loss of heating, hot water and cold water provisions were allowed to ensure hotels guests were not affected in any way.
The Solution
OHS installed a temporary plantroom on the roof area and carried out change over works during night time shutdown. The complete boiler plant was replaced with high efficiency ACV heating and hot water boilers and associated plant items. The cold water booster set was replaced with a inverter type Grundfos booster set during night shutdowns to ensure no the hotel’s guests stay wasn’t not affected. Remove temporary plantroom from the roof area.
The Outcome
OHS successfully replaced all plant items without hotel supply interruptions and inconvenience to the hotels guest and staff.